28695 members and growing – the largest networking group in the maritime industry!

LoginJoin

Sunday, September 22, 2019

Blogs

  • Brazilian Subsea And Maritime News (7) (X)

Tags

Strategic Local FPSO Builders Chosen

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on November 15, 2010

There was still a need for a tender process to select which local company would be responsible for the construction process of the first 8 FPSOs to be built from a total of 40 FPSOs originally calculated to be needed for the pre-salt development.

Temasek Holdings from Singapore Investing in Brazil´s O&G Market

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on October 26, 2010

Negotiations to conclude the deal have been going on for five months and the final agreement has been drawn whereas Temasek bought 14.3 % of OOG for $400 million. OOG´s main interest in the partnership was to attract capital in order to increase…

Unique Corus Tubes for Tupi Project

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on July 9, 2010

Corus Tubes has successfully manufactured 118km of 457mm x 31.75mm Grade X65 sour linepipe for the Petrobras Tupi project. This linepipe is designed to operate in Brazil’s Santos Basin at a depth of 2200m, and is thickest 18” UOE pipe manufactured to date.

Subsea Power Grid to Enable Large-Scale Subsea Processing

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on June 16, 2010

Large-scale seabed processing facilities will require a subsea power grid system that is able to operate for long step-outs with total reliability withstanding extreme pressure and temperatures. As technology leader on land-based power grids…

New Discovery in Caratinga Field and Confirmation of Barracuda Field Potential

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on May 27, 2010

Petrobras has announced the discovery of two new light oil accumulations (29o API) in reservoirs in the Campos Basin's post- and pre-salt areas. The discovery was made by means of the drilling of well 6-CRT-43-RJS, known as Carimbé, located in Caratinga Field…

Two Discoveries in One Well Raise Potential for the Campos Basin Pre-salt

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on March 2, 2010

The Campos Basin pre-salt shows its potential even if volumes are less than at the Santos Basin, as various factors related to logistics, production timeline and development costs make this possibility very attractive to players and specially to Petrobras.

Aker Solutions Showing High Subsea Product Diversity in Brazil

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on January 7, 2010

In November 2009, Aker Solutions do Brasil signed two contracts to supply subsea connection systems for the P-55 platform, which will operate at the Roncador field offshore Brazil. The contracts were signed with Petrobras and Subsea 7. For Petrobras…