28704 members and growing – the largest networking group in the maritime industry!

LoginJoin

Wednesday, October 16, 2019

Blogs

  • Brazilian Subsea And Maritime News (3) (X)

Tags

Strategic Local FPSO Builders Chosen

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on November 15, 2010

There was still a need for a tender process to select which local company would be responsible for the construction process of the first 8 FPSOs to be built from a total of 40 FPSOs originally calculated to be needed for the pre-salt development.

Drill Ship Construction Boom in Brazil

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on September 14, 2010

Petrobras alone is responsible for ordering a total of 28 drill ships of which 9 have already gone through the tendering process and will soon start being built. Transocean is building 9 drill ships at international shipyards, including the Petrobras 10…

Subsea Power Grid to Enable Large-Scale Subsea Processing

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on June 16, 2010

Large-scale seabed processing facilities will require a subsea power grid system that is able to operate for long step-outs with total reliability withstanding extreme pressure and temperatures. As technology leader on land-based power grids…