Subsea Power Grid to Enable Large-Scale Subsea Processing

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on June 16, 2010

Large-scale seabed processing facilities will require a subsea power grid system that is able to operate for long step-outs with total reliability withstanding extreme pressure and temperatures. As technology leader on land-based power grids…

The World´s First All-Electric Intelligent Completion System – Back to the Future

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on April 6, 2010

On Aug. 3, 2003, the world's first subsea, deepwater, all-electric intelligent completion system was installed in the 8-MLS-67HA-RJS well, in 3,540 ft (1,180 m) of water at Marlim Sul field. The well is about 60 miles (100 km) offshore at the Campos basin, Rio de Janeiro, Brazil.